| No. |
CONTRACTOR |
BUYER |
PROJECT |
| 01 |
POSCO E&C |
GWANGYANG |
Gwangyang LNG terminal lpg storage tank EPC project VENT CONDENSER |
| 02 |
Toyo Engineering Ltd. |
|
ISBL ETHYLENE GLYCOL REFRIGERATOR UNIT(MODIFICATION) |
| 03 |
Hyundai Engineering Co., Ltd. |
SAUDI ARABIA |
SUPPLY CONTRACT REFRIGERATION SYSTEM FOR PTC. JUBAIL POLYSILICON PROJECT |
| 04 |
LG CHEM CO., LTD. |
YEOSU |
PBL. REFRIGERATOR(PO NO.4500002977) |
| 05 |
LG Chem. |
DAESAN |
EVA CH903 SPARE OVER-HAUL |
| 06 |
Samsung Engineering Co., Ltd. |
|
(SPIR)CBDC1073-REFRIGERATION EQUI FOR PDH past TRACK |
| 07 |
POSCO E&C |
DAESAN |
Daesan Base Propane Temperature Tank Construction C3 BOG COMPRESSOR |
| 08 |
eTEC E&C |
MALAYSIA |
TPP3 PROJECT Equipment purchase |
| 09 |
BASF SE |
YEOSU |
Yeosu Plant RUC-2640 COMPRESSOR MECH SEAL LEAK REPAIR |
| 10 |
SERVEONE |
|
Annual Inspection Kit |
| 11 |
Eugene Superfreeze Co., Ltd. |
PYEONGTAEK |
Refrigeration facility construction during construction of Pyeongtaek Ohseong Cold Animal Complex |
| 12 |
Hanwha Total Petrochemical Co., Ltd. |
DAESAN |
D2-GC1030A/B;D2-GC1030A/B PCV Addition and design change |
| 13 |
Hanwha Total Petrochemical Co., Ltd. |
DAESAN |
D2-GC1030A/B SPARE PART:MSEAL & BEARING |
| 14 |
SAUDI ACRYLIC ACID COMPANY LTD. |
|
VENDOR SUPERVISION FOR COMPRESSOR |
| 15 |
Hanwha Total Petrochemical Co., Ltd. |
|
A2-GC201 SCREW COMPRESSOR All O/H |
| 16 |
LG Chem. |
DAESAN |
EVA Freezer(CH902) OVERHAUL |
| 17 |
POONG-NAM C&S |
|
PLC PROGRAM(HOWDEN TEMPRO-200) 1SET AND OTHERS |
| 18 |
Hyundai Engineering Co., Ltd. |
|
ANNUAL INSPECTION KIT AND OTHERS |
| 19 |
LG Chem. |
DAESAN |
CH905 overhaul |
| 20 |
SC Engineering Co., Ltd. |
|
VARIANTDONG Relocation of existing refrigerators during firefighting facility improvement work |
| 21 |
Hansung Engineering Co., Ltd. |
|
XRV163 OVERHAUL PARTS 1SET |
| 22 |
Kumho Mitsui Chemicals |
YEOSU |
M-GB320 COMPRESSOR OVERHAUL Corporation |
| 23 |
Hanwha Total Petrochemical Co., Ltd. |
DAESAN |
COMPRESSOR VEARING SET AND OTHERS |
| 24 |
SERVEONE |
DAESAN |
ANNUAL INSPECTION KIT P/N:KW321-6;FOR SSBR COMP WCVB321-22026 AND OTHERS |
| 25 |
SERVEONE |
CHANGWON |
COMPRESSOR ASS'Y XRV127-165 R1 Mvi;CH905 |
| 26 |
Hanwha Chemical Corporation |
|
[CA5-P](CA5-0-29)CL2 CHILLED UNIT VALVE REPLACEMENT AND REVISION |
| 27 |
Kumho Mitsui Chemicals |
|
Outsourcing #15 BRINE UNIT Inspection work |
| 28 |
Kumho Mitsui Chemicals |
|
V-GB805 Refrigerator manufacturing work(Material delivery) |
| 29 |
Kumho P&B Chemicals., Inc |
|
COALESCER ELEMENTS(HOWDEN) PA-7580 Freezer |
| 30 |
Samsung Engineering Co., Ltd. |
|
(SPIR)CBDC1084-SCREW COMPRESSOR(PDH) |
| 31 |
SC Engineering Co., Ltd. |
|
High Viscosity Products COOLING Refrigeration facility installation during facility construction |
| 32 |
Kumho P&B Chemicals., Inc |
|
PA-7580 OIL Replacement work |
| 33 |
Daesung Industrial gases Co., Ltd. |
PAJU |
Paju 2nd Factory 2nd Stage Refrigeration Unit UNIT |
| 34 |
Ocheon yeong-eo johabbeob in |
|
Freezing 20TON 2 chamber freezer |